Kitchen Remodel - Part Five - update

August 18, 2016

After sleeping on it and having my sister in law come over to see what we have, we have decided to keep the cabinets we received. The drawers are flat faced and nothing will be up against a wall with bead board, so we think it will work just fine and not be too much. She said she liked them better than what we originally picked out. Getting too many opinions can be an issue and the bottom line, we have to like it, right? Russ likes it better, now that he got over the shock of not getting what we expected. 

Thank you all for the helpful comments. =) 

Time to get some samples for the counter so we can make that decision!

 photo 2015_sig_zpsfk5a9zt3.png

Kitchen Remodel - Part Five

August 17, 2016

We got the cabinets today (yay!)

But wait... they sent the wrong ones!! 

As you can see, its a perfectly lovely cabinet, except we ordered mission style, not bead board. =(


Our kitchen walls have bead board, so having cabinetry with bead board would be bead board overload!! We didn't discover the mix up until after the store we ordered them from were closed, so we wait until tomorrow to see what the next step is to get this fixed. I am so hoping that we won't have to wait another 4 - 5 weeks for the right ones to be sent. On a positive note, it gives us time to make a final decision on the counter top. We changed our mind the other day about using the marble laminate and going with a mostly black counter instead. Looks like I have time to order samples! 

Some good news, the school house light I ordered from Barn Electric arrived and it is perfection! This will be hung above the sink, when I get one, that is. 


Here's to hoping the cabinet snafu gets solved quickly and without too long of a delay! Maybe I can start a quilting project now!  =)

I hope you are all having a good week! 


 photo 2015_sig_zpsfk5a9zt3.png

Kitchen Remodel - Part four

August 12, 2016

Work has slowed down a lot! We are now cabinet ready, so we wait until they arrive when the busyness will pick up once again. 

Walls are patched...


New ceiling fan...The pendant lights will be hung after the cabinets are installed. They would be in the way of the cabinet install if we hung them up now. We are trying to make things as easy on ourselves as possible!


The stove and dishwasher were delivered last night. I haven't tried out the range yet. The dishwasher is still in the box waiting to be installed when the cabinets come. 


Bigger view of the room with fresh paint on the walls. It's a lovely shade of yellow green called Fresh Willow. =) I don't know what I am going to do with my IKEA island. I love it, but there really isn't a place for it in our home...yet!


The basement door and trim have a fresh coat of paint,


as well as the half bathroom door and trim. Eventually, the trim in the whole house will be painted. It's in terrible shape and it's not special wood in any way, so I don't feel guilty painting it. It looks so much better!


We decided to not replace the whole kitchen door and just replace the window instead. This was a much cheaper and easier option. When the cabinets are moved in and installed, the trim around the kitchen door and the door itself will get a fresh coat of paint. No sense painting it now and have it get banged up when we move things into the house. 


I will be so glad when this project is finished!! The good news is the end is in sight! =D 


 photo 2015_sig_zpsfk5a9zt3.png

Kitchen Remodel - part three

August 3, 2016


We are making a lot of progress! Upper cabinets are gone, the electrical is done, gas is piped in for the new gas range and walls as well as the door frames are prepped for painting. I had to sand the white bead board to knock off the gloss for the new paint. Truly, most of the hard work is done, its just a matter of getting to it. We are exhausted and ready to be done. I am thankful that we haven't run into any surprises during the remodel like many do. 

The lighting and new ceiling fan are all ordered. The cabinet hardware is here and the cabinets should be here in just a couple of more weeks. Next week, the new gas range and dishwasher will arrive. Soon we can get the countertop ordered. All the final decisions have been made, which is huge! I have fretted over every decision. I have been so anxious about making the "right" decision and keeping in budget.

We do need to order a new door. The kitchen door is in terrible shape! The black stuff is the sealant from the window that leaks. I clean it off and then it comes back. All the dirt and grime sticks to it. So gross! I estimate that the door is over 25 years old. We discussed replacing the window and painting the door, but there were more issues that just the window, so replacing it just seems easier and wiser. 


This is the layout of the kitchen, except we chose to remove the cabinet above the sink area and we will put in a shelf there instead. Also, we decided against a farm sink. Too pricey and losing space under the sink was an issue for us. My big splurge was the 5 little drawers next to the sink. I love them!! 


I found this picture of a kitchen that has the same cabinets and laminate we are going to install. It has helped me to visualize what we are trying to get the kitchen to look like. 

White Kitchen with Marble Look Laminate Countertop ~ Akron, OH
Our goal is to have it done by the end of August. I am ready to have a sink back! Doing dishes in the living room with basins is getting old fast! 

Did I mention how much I miss my sewing room?? Soon I will be back to playing with my pretty fabric. =) 

Have a happy Wednesday, everyone!!


 photo 2015_sig_zpsfk5a9zt3.png
Related Posts Plugin for WordPress, Blogger...